Ma Liu Shui reclamation is located at the centre of the Eastern Knowledge and Technology Corridor under "Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending 2030". It is also adjacent to the Chinese University of Hong Kong (CUHK) and the Hong Kong Science Park. By providing the land and development space needed for emerging industries, the project has the potential to enhance the existing innovation and technology (I&T) ecosystem and achieve synergy.
Innovation, Technology and Industry Bureau (ITIB) has engaged the Hong Kong Science and Technology Parks Corporation (HKSTP) to carry out a separate study on the proposed land use/top-side development and the associated infrastructure for the reclamation site. To facilitate the long-term development of the reclamation site, the planning of reprovisioning schemes for existing facilities will take into account the proposed land use in consultation with Innovation and Technology Commission (ITC) and its consultants.
The proposed Ma Liu Shui reclamation project aims to minimise the impact on the surroundings. To minimise impact on water quality and marine ecology nearby, the Reclamation Study will explore the feasibility of adopting the environmentally-friendly reclamation technology – the non-dredged "Deep Cement Mixing" (DCM) method. This method also takes a shorter time than the traditional reclamation method to complete the works.